Digital library of construction informatics and information technology in civil engineering and construction
 
ITC
Digital library
SciX
Tower of Babel
Home All papers Browse by series Browse by authors Browse by keywords Browse by years
Paper: w78-2008-5-05
Paper title: IFC BIM-BASED METHODOLOGY FOR SEMI-AUTOMATED BUILDING ENERGY PERFORMANCE SIMULATION
Authors: Vladimir Bazjanac
Summary: Building energy performance (BEP) simulation is still rarely used in building design, commissioning and operations. The process is too costly and too labor intensive, and it takes too long to deliver results. Its quantitative results are not reproducible due to arbitrary decisions and assumptions made in simulation model definition, and can be trusted only under special circumstances.A methodology to semi-automate BEP simulation preparation and execution makes this process much more effective. It incorporates principles of information science and aims to eliminate inappropriate human intervention that results in subjective and arbitrary decisions. This is achieved by automating every part of the BEP modeling and simulation process that can be automated, by relying on data from original sources, and by making any necessary data transformation rule-based and automated.This paper describes the new methodology and its relationship to IFC-based BIM and software interoperability. It identifies five steps that are critical to its implementation, and shows what part of the methodology can be applied today. The paper concludes with a discussion of application to simulation with EnergyPlus, and describes data transformation rules embedded in the new Geometry Simplification Tool (GST).
Type: normal paper
Year of publication: 2008
Keywords: Simulation, simulation input, IFC-based BIM, interoperable software, data transformation, rules, methodology, semi-automated process
Series: w78:2008
ISSN: 2706-6568
Download paper: /pdfs/w78-2008-5-05.pdf
Citation: Vladimir Bazjanac (2008). IFC BIM-BASED METHODOLOGY FOR SEMI-AUTOMATED BUILDING ENERGY PERFORMANCE SIMULATION. CIB W78 2008 - Improving the management of construction projects through IT adoption (ISSN: 2706-6568), http://itc.scix.net/paper/w78-2008-5-05
hosted by University of Ljubljana University of Ljubljana

includes:

CIB
W78

ECCE

ITcon
© itc.scix.net
inspired by SciX, ported by Robert Klinc [2019]