Paper: w78-2010-112
Paper title: Quantity Take-Off in Model-Based Systems
Authors: Can Ersen Firat, David Arditi, Juho-Pekka Hamalainen, Johan Stenstrand, Juhani Kiiras
Summary: In recent years, as Information Technology (IT) tools and Building Information Models (BIM) are adopted by more practitioners, it has become apparent that it is possible to have a faster and more efficient quantity take-off system. The efficiency of quantity take-off lies in the smart transfer of the information produced in the design process to construction. Existing BIM-based quantity take-off is performed in the design phase of a project. BIM-based systems provide a smart platform for information exchange between design and construction.A “model-based” system refers in this paper to a Building Construction Information Model (BCIM)coupled with a location-based scheduling process.BCIM offers an environment in the construction phase, where data are stored, updated, and reused via the evolving project libraries of a building contractor. BCIM is composed of three submodels:(i) a building product model that provides the sections and quantities, (ii) a building resource and cost model that provides activity lists and labour consumptions to calculate activitydurations, and (iii) a building process model that introduces the interdependencies of the activities.· In the location-based scheduling process, a preliminary master schedule is obtained automaticallyfrom an information database, and then improved by the planner to fit the conditions of the company and of the project. The use of Advanced Line of Balance (ALoB) is proposed in location-based scheduling.The objective of this paper is to introduce the principles involved in quantity take-off in a “modelbased” system as implemented by a contractor. The paper consists of three parts: (1) the “modelbased” system (composed of BCIM and ALoB) is introduced as the theoretical background; (2) the steps in performing quantity take-off in “model-based” systems are described; and (3) a residential construction project is used to test the proposed quantity take-off principles.
Type: normal paper
Year of publication: 2010
Keywords: building information modeling, BIM, model-based systems, location-based scheduling, quantity take-off
Series: w78:2010
ISSN: 2706-6568
Download paper: /pdfs/w78-2010-112.pdf
Citation: Can Ersen Firat, David Arditi, Juho-Pekka Hamalainen, Johan Stenstrand, Juhani Kiiras (2010). Quantity Take-Off in Model-Based Systems. CIB W78 2010 - Applications of IT in the AEC Industry (ISSN: 2706-6568), http://itc.scix.net/paper/w78-2010-112