Paper title: |
Design Coordination with Building Information Modelling – BIM: A Case Study |
Authors: |
E Santos, E Toledo Santos |
Summary: |
Despite some isolated initiatives using 3D CAD or BIM (Building Information Modeling) tools, project processes in the Brazilian AEC industry are still essentially developed using 2D technology, especially in the design development phases. There is evidence in the literature that 2D representations are prone to difficult-to-detect design errors and representation mistakes. BIM is an emerging paradigm based on object oriented, parameterized 3D CAD tools that promises an even better performance in design coordination processes than standard 3D CAD. This work aims to identify the potential for using BIM tools in the design coordination process as a more effective alternative to two-dimensional methods (abstraction and overlaying of drawings for interference checks and clash detection among different design disciplines). The research was based on the execution of a case study involving a complex residential building. Its design was developed as usual, with 2D CAD, as was its coordination process, by professional firms hired by the owner. Afterwards, using the same documents provided to the coordination firm, the first author independently developed the architectural, structural, plumbing, and HVAC BIM models for the standard floor plan of the building, simulating both the Schematic Design (SD) and the Design Development (DD) phases. During and after this process, detected interferences and information errors or omissions were documented in order to be compared with those reported in the traditional process of design coordination. The comparative analysis of both reports in this case study showed that the methodology with BIM detected 75% more design interferences and inconsistencies than the 2D-CAD supported method. This was partly due to the easier visualization of the virtual model, and to the software features for automating interference checks. On the other hand, the analysis of the interferences found in both processes demonstrated that the modeling procedure alone can affect design perception and evaluation, allowing the detection of a greater number of incompatibilities during the process. |
Type: |
conference paper |
Year of publication: |
2011 |
Keywords: |
Design Coordination, BIM, Clash Detection, Case study |
Series: |
w78:2011 |
ISSN: |
2706-6568 |
Download paper: |
/pdfs/w78-2011-Paper-12.pdf |
Citation: |
E Santos, E Toledo Santos (2011).
Design Coordination with Building Information Modelling – BIM: A Case Study. Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October (ISSN: 2706-6568),
http://itc.scix.net/paper/w78-2011-Paper-12
|