Paper title: | The Interaction of Contractor’s Cost Flow with Operational Practice: A Simulation Study |
Authors: | P Wallström, W Lu, T Olofsson |
Summary: | |
Type: | conference paper |
Year of publication: | 2013 |
Series: | w78:2013 |
ISSN: | 2706-6568 |
Download paper: | /pdfs/w78-2013-paper-35.pdf |
Citation: | P Wallström, W Lu, T Olofsson (2013). The Interaction of Contractor’s Cost Flow with Operational Practice: A Simulation Study. Proceedings of the 30th International Conference of CIB W78, Beijing, China, 19-12 October, 243-251 (ISSN: 2706-6568), http://itc.scix.net/paper/w78-2013-paper-35 |