Digital library of construction informatics and information technology in civil engineering and construction
ITC
Digital library
Home
All papers
Browse by series
Browse by authors
Browse by keywords
Browse by years
Papers authored by Dawood:
Year
Paper
Year
Paper
2002
Dawood N, Sriprasert E, Mallasi Z, Hobbs B (2002).
4D visualisation development: real life case studies
.
Agger K (ed.); Distributing knowledge in building; Arhus, June 12 - 14, Denmark
2006
Dawood, Nash; Miles, John (2006).
A Future Vision for a Virtual Reality and Search-Based Outline Design Environment for the AEC Industry
.
2013
M Kassem, B Succar, N Dawood (2013).
A Proposed Approach to Comparing the BIM Maturity of Countries
.
Proceedings of the 30th International Conference of CIB W78, Beijing, China, 19-12 October, 368-378
2014
A Albogamy, N Dawood, D Scott (2014).
A Risk Management Approach to Address Construction Delays from the Client Aspect
.
Proceedings of the 31st International Conference of CIB W78, Orlando, Florida, USA, 23-25 June, 1497-1505
2015
J Patacas, N Dawood, M Kassem (2015).
A framework for the development of Asset Information Models to support Asset Information Requirements throughout the lifecycle of buildings
.
Proceedings of the 32nd International Conference of CIB W78, Eindhoven, The Netherlands, 27-29 October, 609-618
2003
Mallasi Z, Dawood N (2003).
A generic inclusion of space strategies with activity execution patterns in 4D tools
.
Amor R (editor) Proceedings of the CIB W78's 20th International Conference on Construction IT, Construction IT Bridging the Distance, CIB Report 284, ISBN 0-908689-71-3, Waiheke Island, New Zealand, 23-25 April 2003, pg. 213-223.
2013
Rasys E,Hodds M,Dawood N,Kassem M (2013).
A web3d enabled information integration framework for facility management
.
CONVR 2013
2009
R. Kapur Shah, N. Dawood & J. Dean (2009).
An Innovative Approach for Generation of Virtual Construction Model and a Time Location Plan for Road Construction Projects
.
CIB W078 2009
2007
Dawood, Nash and Shah, Raj Kapur (2007).
An Innovative Approach for Improvement Of Communications through Visual Schedule Model in Road Construction
.
7th International Conference on Construction Applications of Virtual Reality (CONVR 2007), Oct. 22-23, University Park, PA, 216-223.
2006
Sushant Sikka, Nashwan Dawood and Ramesh Marasini (2006).
An Integration Of Construction Site Logistics & Associated Vehicle Movements (Inside And Outside The Construction Site) Towards A Sustainable Construction
.
Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June
2005
V Benjaoran & N Dawood (2005).
An application of Artificial Intelligence Planner for bespoke precast concrete production planning: a case study
.
2003
Dawood N, Sriprasert E, Mallasi Z, Scott D (2003).
An industrial evaluation of the virtual construction site (VIRCON) tools
.
Amor R (editor) Proceedings of the CIB W78's 20th International Conference on Construction IT, Construction IT Bridging the Distance, CIB Report 284, ISBN 0-908689-71-3, Waiheke Island, New Zealand, 23-25 April 2003, pg. 97-105.
2014
A Mhalas, T Crosbie, N Dawood, M Kassem (2014).
Assessing Energy Improvement Potential from Efficiency and Renewable Interventions at Neighborhood Level
.
Proceedings of the 31st International Conference of CIB W78, Orlando, Florida, USA, 23-25 June, 1602-1609
2013
Shah R,Dawood N,Castro S (2013).
Automatic generation and visualization of location-based scheduling
.
CONVR 2013
2012
M Kassem, T Brogden, N Dawood (2012).
BIM and 4D Planning: An Empirical Study of The Industry Uptake and Issues Affecting Their Widespread Use
.
Proceedings of the 29th International Conference of CIB W78, Beirut, Lebanon, 17-19 October, 42-51
2013
Kelly G,Serginson M,Lockley S,Dawood N,Kassem M (2013).
BIM for facility management: a review and a case study investigating the value and challenges
.
CONVR 2013
2014
N Dawood, G Miller, J Patacas, M Kassem (2014).
Combining Serious Games and 4D Modelling for Construction Health and Safety Training
.
Proceedings of the 31st International Conference of CIB W78, Orlando, Florida, USA, 23-25 June, 2087-2094
2000
Akinsola A, Dawood N, Hobbs B (2000).
Construction planning process improvement using information technology
.
Construction Information Technology 2000. Taking the construction industry into the 21st century.; ISBN 9979-9174-3-1; Reykjavik, Iceland, June 28 - 30, 2000
2006
Serafim Castro and Nashwan Dawood (2006).
Development And Implantation Of Simulation Modelling In Road Construction Planning: The Case Of RoadSim
.
Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June
2006
Dawood, Nashwan; Makanae, Koji (2006).
Development and Evaluation of a Terrain Representation System for Highway Route Planning
.
2009
A. Al-Bazi, N. Dawood & Z. Khan (2009).
Development of Hybrid Simulation and Genetic Algorithms System for Solving Complex Crew Allocation Problems
.
CIB W078 2009
2002
Dawood N, Sriprasert E, Mallasi Z, Hobbs B (2002).
Development of an integrated information resource base for 4D/VR construction process simulation and visualisation
.
Agger K (ed.); Distributing knowledge in building; Arhus, June 12 - 14, Denmark
2007
Raj Kapur Shah, Nashwan Dawood (2007).
Development of innovative visualisation model in road construction
.
499
2020
A Akponeware, N Dawood, S Rodriguez, H Dawood (2020).
Exploring the Development of a BIM-Enabled Process Framework for LCA of Rail Tracks
.
Proceedings of the 37th International Conference of CIB W78, Sao Paulo - online, BR, 18-20 August, pp. 168-184
2003
Sriprasert E, Dawood N (2003).
Genetic algorithms for multi-constraint scheduling: an application for the construction industry
.
Amor R (editor) Proceedings of the CIB W78's 20th International Conference on Construction IT, Construction IT Bridging the Distance, CIB Report 284, ISBN 0-908689-71-3, Waiheke Island, New Zealand, 23-25 April 2003, pg. 341-353.
2008
R. K. Shah, N. Dawood (2008).
IMPROVING COMMUNICATION OF SCHEDULING INFORMATION OF EARTHWORK CONSTRUCTION PROCESS USING 4D VISUALISATION MODEL IN ROAD PROJECTS
.
CIB W78 2008 - Improving the management of construction projects through IT adoption
2007
Nashwan Dawood, Ammar Al-Bazi (2007).
Improving the performance and reliability of construction supply chain using simulation: a case study for doorsets manufacturing -DOORSSIM-
.
483
2007
Anfas Thowfeek, Nashwan Dawood, Ramesh Marasini, John Dean (2007).
Industrial case study of innovative managerial control system applied to site control process (IMCS-CON)
.
309
2017
Tracey Crosbie, John Broderick, Muneeb Dawood, Richard Charlesworth, Vladimir Vukovic, Michael Short and Nashwan Dawood (2017).
Integrating Technologies for Demand Response in Blocks of Buildings - A UK Case Study
.
Lean and Computing in Construction Congress (LC3): Volume I Ð Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 193-200
2017
T Crosbie, J Broderick, M Dawood, R Charlesworth, V Vukovic, M Short, N Dawood (2017).
Integrating Technologies for Demand Response in Blocks of Buildings - A UK Case Study
.
Proceedings of the 34th International Conference of CIB W78, Heraklion, Crete, Greece, 4-7 July, pp. 193-200
2002
Sriprasert E, Dawood N (2002).
Lean enterprise web-based information system for construction (LEWIS): a framework
.
Agger K (ed.); Distributing knowledge in building; Arhus, June 12 - 14, Denmark
2007
Dawood, Nash and Sikka, Sushant (2007).
Measuring the Effectiveness of 4D Planning as a Valuable Communication Tool
.
7th International Conference on Construction Applications of Virtual Reality (CONVR 2007), Oct. 22-23, University Park, PA, 198-205.
2007
Nashwan Dawood, Sushant Sikka (2007).
Measuring the efectiveness of 4D planning as a valuable communication tool
.
393
2012
N Al Jurf, N Dawood, K Naji (2012).
New Methods for Health and Safety Training in the Qatar Building Construction Industry
.
Proceedings of the 29th International Conference of CIB W78, Beirut, Lebanon, 17-19 October, 374-383
2001
Marasini R, Dawood N, Dean J (2001).
Real-time management of stockyard using integrated digital technologies
.
Coetzee G, Boshoff F (ed.); IT in construction in Africa 2001; Mpumalunga, 30 May - 1 June, South Africa; ISBN 0-7988-5531-2
2017
Joao Patacas, Huda Dawood and Nashwan Dawood (2017).
Reality Capture and Visualisation of 3D Oil & Gas Facility Data for Operations and Decommissioning
.
Lean and Computing in Construction Congress (LC3): Volume I Ð Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 201-208
2017
J Patacas, H Dawood, N Dawood (2017).
Reality Capture and Visualisation of 3D Oil & Gas Facility Data for Operations and Decommissioning
.
Proceedings of the 34th International Conference of CIB W78, Heraklion, Crete, Greece, 4-7 July, pp. 201-208
2002
Mallasi Z, Dawood N N (2002).
Registering space requirements of construction operations using site-PECASO model
.
Agger K (ed.); Distributing knowledge in building; Arhus, June 12 - 14, Denmark
2015
O Tapponi, M Kassem, G Kelly, N Dawood, B White (2015).
Renovation of Heritage Assets using BIM: a Case Study of the Durham Cathedral
.
Proceedings of the 32nd International Conference of CIB W78, Eindhoven, The Netherlands, 27-29 October, 706-715
2002
Sriprasert E, Dawood N (2002).
Requirements identification for 4D constraintbased construction planning and control system
.
Agger K (ed.); Distributing knowledge in building; Arhus, June 12 - 14, Denmark
2013
Kassem M,Chavada R,Dawood N,Benghi C,Sanches R (2013).
Road construction projects: an integrated and interactive visual tool for planning earthwork operations
.
CONVR 2013
2000
Marasini R, Dawood N (2000).
Simulation approach to optimise stockyard layout: a case study in precast concrete products industry
.
Construction Information Technology 2000. Taking the construction industry into the 21st century.; ISBN 9979-9174-3-1; Reykjavik, Iceland, June 28 - 30, 2000
2001
Marasini R, Dawood N (2001).
Stockyard layout management for precast concrete products using simulation
.
Coetzee G, Boshoff F (ed.); IT in construction in Africa 2001; Mpumalunga, 30 May - 1 June, South Africa; ISBN 0-7988-5531-2
2014
J Munkley, M Kassem, N Dawood (2014).
Synchronous Building Information Model-Based Collaboration in the Cloud: A Proposed Low Cost IT Platform and a Case Study
.
Proceedings of the 31st International Conference of CIB W78, Orlando, Florida, USA, 23-25 June, 89-96
2006
Nashwan Dawood, Sushant Sikka, Barry Ramsay, Chris Allen, Naveed Khan (2006).
The Potential Value Of 4D Planning In UK Construction Industry
.
Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June
2013
Addison A,O’Hare W-T,Kassem M,Dawood N (2013).
The importance of engaging engineering and construction learners in virtual worlds and serious games
.
CONVR 2013
2006
Dawood, Nashwan; Dean, John; Marasini, Ramesh (2006).
VR-Roadmap: a Vision for 2030 in the Built Environment
.
2002
Christiansson P, Dawood N, Svidt K (2002).
Virtual buildings (VB) and tools to manage construction process operations
.
Agger K (ed.); Distributing knowledge in building; Arhus, June 12 - 14, Denmark
2006
Dawood, Nashwan; Sikka, Sushant (2006).
Visual 4D Planning in the UK Construction Industry
.
2020
Y Alani, N Dawood, S Rodriguez, H Dawood (2020).
Whole Life Cycle Construction Information Flow using Semantic Web Technologies: A Case for Infrastructure Projects
.
Proceedings of the 37th International Conference of CIB W78, Sao Paulo - online, BR, 18-20 August, pp. 141-155
hosted by University of Ljubljana
includes:
W78
© itc.scix.net
inspired by SciX, ported by Robert Klinc [2019]