2002 |
Dawood N, Sriprasert E, Mallasi Z, Hobbs B (2002).
4D visualisation development: real life case studies. Agger K (ed.); Distributing knowledge in building; Arhus, June 12 - 14, Denmark
|
2006 |
Dawood, Nash; Miles, John (2006).
A Future Vision for a Virtual Reality and Search-Based Outline Design Environment for the AEC Industry.
|
2013 |
M Kassem, B Succar, N Dawood (2013).
A Proposed Approach to Comparing the BIM Maturity of Countries. Proceedings of the 30th International Conference of CIB W78, Beijing, China, 19-12 October, 368-378
|
2014 |
A Albogamy, N Dawood, D Scott (2014).
A Risk Management Approach to Address Construction Delays from the Client Aspect. Proceedings of the 31st International Conference of CIB W78, Orlando, Florida, USA, 23-25 June, 1497-1505
|
2014 |
S Tak, S Woo, H Yeo (2014).
A Study of the Framework on Collision Risk Warning System Using Loop Detector and Vehicle Information. Proceedings of the 31st International Conference of CIB W78, Orlando, Florida, USA, 23-25 June, 1134-1141
|
2015 |
J Patacas, N Dawood, M Kassem (2015).
A framework for the development of Asset Information Models to support Asset Information Requirements throughout the lifecycle of buildings. Proceedings of the 32nd International Conference of CIB W78, Eindhoven, The Netherlands, 27-29 October, 609-618
|
2003 |
Mallasi Z, Dawood N (2003).
A generic inclusion of space strategies with activity execution patterns in 4D tools. Amor R (editor) Proceedings of the CIB W78's 20th International Conference on Construction IT, Construction IT Bridging the Distance, CIB Report 284, ISBN 0-908689-71-3, Waiheke Island, New Zealand, 23-25 April 2003, pg. 213-223.
|
1994 |
Alshawi M, Underwood J (1994).
A process and an object oriented analysis to integrate design and construction. Preproceedings, CIB W78 Workshop on Computer Integrated Construction, VTT, Espoo, Finland.
|
2017 |
Kim, ChanWoo; Kyung-Min Kim (2017).
A study on the determinants of office rent: the cases of world cities. 24th Annual European Real Estate Society Conference in Delft, Netherlands
|
2013 |
Rasys E,Hodds M,Dawood N,Kassem M (2013).
A web3d enabled information integration framework for facility management. CONVR 2013
|
2007 |
Lam, Selina; Kinayoglu, Gokce; and Kim, Seung Wook (2007).
Agents for Multi-User Virtual Environment (MUVE). 7th International Conference on Construction Applications of Virtual Reality (CONVR 2007), Oct. 22-23, University Park, PA, 60-69.
|
2009 |
R. Kapur Shah, N. Dawood & J. Dean (2009).
An Innovative Approach for Generation of Virtual Construction Model and a Time Location Plan for Road Construction Projects. CIB W078 2009
|
2007 |
Dawood, Nash and Shah, Raj Kapur (2007).
An Innovative Approach for Improvement Of Communications through Visual Schedule Model in Road Construction. 7th International Conference on Construction Applications of Virtual Reality (CONVR 2007), Oct. 22-23, University Park, PA, 216-223.
|
2006 |
Sushant Sikka, Nashwan Dawood and Ramesh Marasini (2006).
An Integration Of Construction Site Logistics & Associated Vehicle Movements (Inside And Outside The Construction Site) Towards A Sustainable Construction. Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June
|
2005 |
V Benjaoran & N Dawood (2005).
An application of Artificial Intelligence Planner for bespoke precast concrete production planning: a case study.
|
2003 |
Dawood N, Sriprasert E, Mallasi Z, Scott D (2003).
An industrial evaluation of the virtual construction site (VIRCON) tools. Amor R (editor) Proceedings of the CIB W78's 20th International Conference on Construction IT, Construction IT Bridging the Distance, CIB Report 284, ISBN 0-908689-71-3, Waiheke Island, New Zealand, 23-25 April 2003, pg. 97-105.
|
1992 |
Woolsey L (1992).
An integrated approach to codes, standards and products. Vanier D, Russell T (ed.); Computers and information in construction; Montreal, May, Canada
|
2000 |
Woodbury R, Burrow A, Drogemuller R, Datta S (2000).
An introduction to representation comparison. Construction Information Technology 2000. Taking the construction industry into the 21st century.; ISBN 9979-9174-3-1; Reykjavik, Iceland, June 28 - 30, 2000
|
2011 |
Heywood, Christopher (2011).
Approaches to Aligning Corporate Real Estate and Organisational StrategyORGANISATIONAL STRATEGY. 18th Annual European Real Estate Society Conference in Eindhoven, the Netherlands
|
2014 |
A Mhalas, T Crosbie, N Dawood, M Kassem (2014).
Assessing Energy Improvement Potential from Efficiency and Renewable Interventions at Neighborhood Level. Proceedings of the 31st International Conference of CIB W78, Orlando, Florida, USA, 23-25 June, 1602-1609
|
2013 |
Shah R,Dawood N,Castro S (2013).
Automatic generation and visualization of location-based scheduling. CONVR 2013
|
2017 |
Karim Farghaly, Henry Abanda, Christos Vidalakis and Graham Wood (2017).
BIM Big Data System Architecture for Asset Management: A Conceptual Framework. Lean and Computing in Construction Congress (LC3): Volume I Ð Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 289-296
|
2017 |
K Farghaly, H Abanda, C Vidalakis, G Wood (2017).
BIM Big Data System Architecture for Asset Management: A Conceptual Framework . Proceedings of the 34th International Conference of CIB W78, Heraklion, Crete, Greece, 4-7 July, pp. 289-296
|
2012 |
M Kassem, T Brogden, N Dawood (2012).
BIM and 4D Planning: An Empirical Study of The Industry Uptake and Issues Affecting Their Widespread Use. Proceedings of the 29th International Conference of CIB W78, Beirut, Lebanon, 17-19 October, 42-51
|
2016 |
K F Ibrahim, F H Abanda, C Vidalakis, G Woods (2016).
BIM for FM: Input versus Output data. Proceedings of the 33rd International Conference of CIB W78, Brisbane, Australia, 31 October - 2 November
|
2013 |
Kelly G,Serginson M,Lockley S,Dawood N,Kassem M (2013).
BIM for facility management: a review and a case study investigating the value and challenges. CONVR 2013
|
2011 |
U Isikdag, J Underwood, V Ezcan, S Arslan (2011).
Barriers to e-procurement in Turkish AEC Industry. Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October
|
2018 |
J Li, D Greenwood, M Kassem (2018).
Blockchain in the Construction Sector: A Socio-technical Systems Framework for the Construction Industry. Proceedings of the 35th International Conference of CIB W78, Chicago, USA, 1-3 October, pp. 51-58
|
2014 |
J-H Woo, B Gleason (2014).
Building Energy Benchmarking with Building Information Modeling and Wireless Sensor Technologies for Building Retrofits. Proceedings of the 31st International Conference of CIB W78, Orlando, Florida, USA, 23-25 June, 1150-1157
|
2007 |
Umit Isikdag, Ghassan Aouad, Jason Underwood, Song Wu (2007).
Building information models: a review on storage and exchange mechanisms. 135
|
2007 |
Charles Woodward, Jani Lahti, Jukka Rönkkö, Petri Honkamaa, Mika Hakkarainen, Jani Jäppinen, Kari Rainio, Sanni Siltanen, Jouko Hyväkkä (2007).
Case digitalo – a range of virtual and augmented reality solutions in construction application. 529
|
2017 |
Gage Christianson, Evan Wilson, Matthew Henke, Omar Ahlnaity and Jeong Woo (2017).
Cloud-Based Project Management: Selecting IT Solutions for Construction Companies. Lean and Computing in Construction Congress (LC3): Volume I Ð Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 867-875
|
2017 |
G Christianson, E Wilson, M Henke, O Ahlnaity, J Woo (2017).
Cloud-Based Project Management: Selecting IT Solutions for Construction Companies . Proceedings of the 34th International Conference of CIB W78, Heraklion, Crete, Greece, 4-7 July, pp. 867-876
|
2014 |
N Dawood, G Miller, J Patacas, M Kassem (2014).
Combining Serious Games and 4D Modelling for Construction Health and Safety Training. Proceedings of the 31st International Conference of CIB W78, Orlando, Florida, USA, 23-25 June, 2087-2094
|
2016 |
Hyun, Dongwoo (2016).
Conform or Resist? The Spatial Dynamic Effect in House Prices during the Boom and Recession period. 23rd Annual European Real Estate Society Conference in Regensburg, Germany
|
2000 |
Akinsola A, Dawood N, Hobbs B (2000).
Construction planning process improvement using information technology. Construction Information Technology 2000. Taking the construction industry into the 21st century.; ISBN 9979-9174-3-1; Reykjavik, Iceland, June 28 - 30, 2000
|
2008 |
Hee-Sung Cha, Kyungrai Kim, Dong-Woo Shin (2008).
DEVELOPMENT OF 5D-CAD BASED WORK PROCESS MODEL FOR AGED-HOUSING REVAMP PROJECTS. CIB W78 2008 - Improving the management of construction projects through IT adoption
|
2011 |
A Redmond, A Hore, R West, J Underwood, M Alshawi (2011).
Developing a Horizontal Integrated Life Cycle Costing Analysis Model through BIM . Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October
|
2002 |
Lee A, Betts M, Aouad G, Cooper R, Wu S, Underwood J (2002).
Developing a vision for an nD modelling tool. Agger K (ed.); Distributing knowledge in building; Arhus, June 12 - 14, Denmark
|
2006 |
Serafim Castro and Nashwan Dawood (2006).
Development And Implantation Of Simulation Modelling In Road Construction Planning: The Case Of RoadSim. Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June
|
2006 |
Dawood, Nashwan; Makanae, Koji (2006).
Development and Evaluation of a Terrain Representation System for Highway Route Planning.
|
2009 |
A. Al-Bazi, N. Dawood & Z. Khan (2009).
Development of Hybrid Simulation and Genetic Algorithms System for Solving Complex Crew Allocation Problems. CIB W078 2009
|
2002 |
Dawood N, Sriprasert E, Mallasi Z, Hobbs B (2002).
Development of an integrated information resource base for 4D/VR construction process simulation and visualisation. Agger K (ed.); Distributing knowledge in building; Arhus, June 12 - 14, Denmark
|
2007 |
Raj Kapur Shah, Nashwan Dawood (2007).
Development of innovative visualisation model in road construction. 499
|
2011 |
G Kapogiannis, F Khosrowshahi, J Underwood (2011).
Digital Services for Construction Small and Medium Enterprises: A Conceptual Business Model. Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October
|
2018 |
R Edirisinghe, J Woo (2018).
Drive Towards Real-Time Reasoning of Building Performance: Development of a Live, Cloud-Based System. Proceedings of the 35th International Conference of CIB W78, Chicago, USA, 1-3 October, pp. 661-668
|
1999 |
Woodbury R F, Datta S, Chan T-W, Burrow A L (1999).
Exploring and comparing designs: the same game?. Lacasse M A, Vanier D J (ed.); Information technology in construction, volume 4, ISBN 0-660-17743-9; Vancouver, May 30 - June 3, Canada
|
2020 |
A Akponeware, N Dawood, S Rodriguez, H Dawood (2020).
Exploring the Development of a BIM-Enabled Process Framework for LCA of Rail Tracks. Proceedings of the 37th International Conference of CIB W78, Sao Paulo - online, BR, 18-20 August, pp. 168-184
|
2000 |
Drogemuller R, Woodbury R, Crawford J (2000).
Extracting representation from structured text: initial steps. Construction Information Technology 2000. Taking the construction industry into the 21st century.; ISBN 9979-9174-3-1; Reykjavik, Iceland, June 28 - 30, 2000
|
2003 |
Sriprasert E, Dawood N (2003).
Genetic algorithms for multi-constraint scheduling: an application for the construction industry. Amor R (editor) Proceedings of the CIB W78's 20th International Conference on Construction IT, Construction IT Bridging the Distance, CIB Report 284, ISBN 0-908689-71-3, Waiheke Island, New Zealand, 23-25 April 2003, pg. 341-353.
|
2000 |
Chang T W, Woodbury R (2000).
Geometric typed feature structures: carrying geometric information using typed feature structures. Construction Information Technology 2000. Taking the construction industry into the 21st century.; ISBN 9979-9174-3-1; Reykjavik, Iceland, June 28 - 30, 2000
|
2008 |
R. K. Shah, N. Dawood (2008).
IMPROVING COMMUNICATION OF SCHEDULING INFORMATION OF EARTHWORK CONSTRUCTION PROCESS USING 4D VISUALISATION MODEL IN ROAD PROJECTS. CIB W78 2008 - Improving the management of construction projects through IT adoption
|
2010 |
Kirkwood, John (2010).
INSPIRATIONAL LEARNING: A CASE STUDY OF DEVELOPMENT PRACTICE. 17th Annual European Real Estate Society Conference in Milan, Italy
|
2006 |
JeongWook Son and Feniosky Peña-Mora (2006).
Improvement Of Collaboration Among Civil Engineers And First Responders During Disaster In Urban Areas. Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June
|
2007 |
Nashwan Dawood, Ammar Al-Bazi (2007).
Improving the performance and reliability of construction supply chain using simulation: a case study for doorsets manufacturing -DOORSSIM-. 483
|
2004 |
Jayne, Michael; Lynch-Wood, Gary; Williamson, David (2004).
Industrial Estates, Waste, Environmental Liability and the Property Manager. 11th European Real Estate Society Conference (2-5 June 2004) Milano, Italy
|
2007 |
Anfas Thowfeek, Nashwan Dawood, Ramesh Marasini, John Dean (2007).
Industrial case study of innovative managerial control system applied to site control process (IMCS-CON). 309
|
2019 |
J Smallwood, C Allen (2019).
Industry 4.0 in Construction: Practitioners’ Perceptions. Proceedings of the 36th International Conference of CIB W78, Newcastle-upon-Tyne, UK, 18-20 September, pp. 53-62
|
2007 |
Kahkonen, Kalle; Hyvakka, Jouko; Porkka, Janne; Siltanen, Sanni and Woodward, Charles (2007).
Integrating Building Product Models with Live Video Stream. 7th International Conference on Construction Applications of Virtual Reality (CONVR 2007), Oct. 22-23, University Park, PA, 176-188.
|
2017 |
Tracey Crosbie, John Broderick, Muneeb Dawood, Richard Charlesworth, Vladimir Vukovic, Michael Short and Nashwan Dawood (2017).
Integrating Technologies for Demand Response in Blocks of Buildings - A UK Case Study. Lean and Computing in Construction Congress (LC3): Volume I Ð Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 193-200
|
2017 |
T Crosbie, J Broderick, M Dawood, R Charlesworth, V Vukovic, M Short, N Dawood (2017).
Integrating Technologies for Demand Response in Blocks of Buildings - A UK Case Study . Proceedings of the 34th International Conference of CIB W78, Heraklion, Crete, Greece, 4-7 July, pp. 193-200
|
1997 |
Underwood J, Alshawi M (1997).
Integrating project estimating, interim valuation, maintenanceforecasting, and physical interference detecting. Drogemuller R (editor); International council for building research studies and documentation. workshop (1997, Cairns) Information technology support for construction process reengineering Proceedings of CIB workshop - w78 “Working commission on information technology in construction” and tg10 “Task group on computer representation of design standards and building codes”, Cairns, Queensland, Australia, July 9th-11th, 1997; ISBN 086-443-636X
|
2007 |
Umit Isikdag, Ghassan Aouad, Jason Underwood, Nigel Trodd (2007).
Investigating the applicability of IFC in geospatial environment in order to facilitate the fire response management process. 97
|
2002 |
Sriprasert E, Dawood N (2002).
Lean enterprise web-based information system for construction (LEWIS): a framework. Agger K (ed.); Distributing knowledge in building; Arhus, June 12 - 14, Denmark
|
2007 |
Dawood, Nash and Sikka, Sushant (2007).
Measuring the Effectiveness of 4D Planning as a Valuable Communication Tool. 7th International Conference on Construction Applications of Virtual Reality (CONVR 2007), Oct. 22-23, University Park, PA, 198-205.
|
2007 |
Nashwan Dawood, Sushant Sikka (2007).
Measuring the efectiveness of 4D planning as a valuable communication tool. 393
|
2017 |
Heywood, Christopher; Monique Arkesteijn (2017).
Meta-Corporate Real Estate Management: Some preliminary thoughts. 24th Annual European Real Estate Society Conference in Delft, Netherlands
|
2006 |
Victor Y. Chen, Cheryl Z. Qian, and Robert F. Woodbury (2006).
Near: Visualizing Information Relations In The Multimedia Repository A•VI•RE. Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June
|
2012 |
N Al Jurf, N Dawood, K Naji (2012).
New Methods for Health and Safety Training in the Qatar Building Construction Industry. Proceedings of the 29th International Conference of CIB W78, Beirut, Lebanon, 17-19 October, 374-383
|
2017 |
Jeehee Lee, June-Seong Yi, Jeongwook Son and Ye-Eun Jang (2017).
Pre-Bid Clarification for Construction Project Risk Identification Using Unstructured Text Data Analysis. Lean and Computing in Construction Congress (LC3): Volume I Ð Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 219-227
|
2001 |
Marasini R, Dawood N, Dean J (2001).
Real-time management of stockyard using integrated digital technologies. Coetzee G, Boshoff F (ed.); IT in construction in Africa 2001; Mpumalunga, 30 May - 1 June, South Africa; ISBN 0-7988-5531-2
|
2017 |
Joao Patacas, Huda Dawood and Nashwan Dawood (2017).
Reality Capture and Visualisation of 3D Oil & Gas Facility Data for Operations and Decommissioning. Lean and Computing in Construction Congress (LC3): Volume I Ð Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 201-208
|
2017 |
J Patacas, H Dawood, N Dawood (2017).
Reality Capture and Visualisation of 3D Oil & Gas Facility Data for Operations and Decommissioning . Proceedings of the 34th International Conference of CIB W78, Heraklion, Crete, Greece, 4-7 July, pp. 201-208
|
2002 |
Mallasi Z, Dawood N N (2002).
Registering space requirements of construction operations using site-PECASO model. Agger K (ed.); Distributing knowledge in building; Arhus, June 12 - 14, Denmark
|
2015 |
O Tapponi, M Kassem, G Kelly, N Dawood, B White (2015).
Renovation of Heritage Assets using BIM: a Case Study of the Durham Cathedral. Proceedings of the 32nd International Conference of CIB W78, Eindhoven, The Netherlands, 27-29 October, 706-715
|
2002 |
Sriprasert E, Dawood N (2002).
Requirements identification for 4D constraintbased construction planning and control system. Agger K (ed.); Distributing knowledge in building; Arhus, June 12 - 14, Denmark
|
2013 |
Kassem M,Chavada R,Dawood N,Benghi C,Sanches R (2013).
Road construction projects: an integrated and interactive visual tool for planning earthwork operations. CONVR 2013
|
2007 |
Kirkwood, John (2007).
Semi-automated Assessment Using New Technology. 3rd ERES EDUCATION SEMINAR - ESSEC Business School, December 7-8 2007
|
2006 |
Kim, Jin-Woo, Kim, Taek-Soo, and Lee, Yong-Hee (2006).
Shape Formation Of Space Structure With Ball Type Joint.. Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June
|
2000 |
Marasini R, Dawood N (2000).
Simulation approach to optimise stockyard layout: a case study in precast concrete products industry. Construction Information Technology 2000. Taking the construction industry into the 21st century.; ISBN 9979-9174-3-1; Reykjavik, Iceland, June 28 - 30, 2000
|
2009 |
M. Hakkarainen, C. Woodward & Kari Rainio (2009).
Software Architecture for Mobile Mixed Reality and 4D BIM Interaction. CIB W078 2009
|
2019 |
D Sanchez, D Greenwood, C Benghi, V Atanasov, A Parry (2019).
Specifying the information requirements for Forensic Delay Analysis. Proceedings of the 36th International Conference of CIB W78, Newcastle-upon-Tyne, UK, 18-20 September, pp. 679-688
|
2001 |
Marasini R, Dawood N (2001).
Stockyard layout management for precast concrete products using simulation. Coetzee G, Boshoff F (ed.); IT in construction in Africa 2001; Mpumalunga, 30 May - 1 June, South Africa; ISBN 0-7988-5531-2
|
2014 |
J Munkley, M Kassem, N Dawood (2014).
Synchronous Building Information Model-Based Collaboration in the Cloud: A Proposed Low Cost IT Platform and a Case Study. Proceedings of the 31st International Conference of CIB W78, Orlando, Florida, USA, 23-25 June, 89-96
|
2011 |
D Greenwood, S Lockley, O Jones, P Jones (2011).
THE EFFICACY OF REALISTIC VIRTUAL ENVIRONMENTS IN CAPTURING USER EXPERIENCE OF BUILDINGS. Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October
|
2006 |
Nashwan Dawood, Sushant Sikka, Barry Ramsay, Chris Allen, Naveed Khan (2006).
The Potential Value Of 4D Planning In UK Construction Industry. Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June
|
1999 |
Underwood J, Alshawi M A, Aouad G, Child T, Faraj I (1999).
The dynamic definition of design element specifications via a product supplier database website. Lacasse M A, Vanier D J (ed.); Information technology in construction, volume 4, ISBN 0-660-17743-9; Vancouver, May 30 - June 3, Canada
|
1998 |
Alshawi M, Aouad G, Child T, Faraj I, Underwood J (1998).
The implementation of the industry foundation classes in integrated environments. Bjork B C, Jagbecj A (ed.); The life-cycle of construction IT innovations. - Technology transfer from research to practice. [ Conference Proceedings / ISBN 91-7171-281-4] Stockholm (Sweden) 3-5 June 1998
|
2013 |
Addison A,O’Hare W-T,Kassem M,Dawood N (2013).
The importance of engaging engineering and construction learners in virtual worlds and serious games. CONVR 2013
|
2019 |
O Doukari, D Greenwood (2019).
Towards an automatic approach to generating BIM models from digitized plans. Proceedings of the 36th International Conference of CIB W78, Newcastle-upon-Tyne, UK, 18-20 September, pp. 467-474
|
2019 |
K Kelly, J Charlton, D Greenwood (2019).
Understanding the complexities of managing historic buildings through heritage BIM: a case study of Durham Cathedral. Proceedings of the 36th International Conference of CIB W78, Newcastle-upon-Tyne, UK, 18-20 September, pp. 255-264
|
2006 |
Dawood, Nashwan; Dean, John; Marasini, Ramesh (2006).
VR-Roadmap: a Vision for 2030 in the Built Environment.
|
2002 |
Christiansson P, Dawood N, Svidt K (2002).
Virtual buildings (VB) and tools to manage construction process operations. Agger K (ed.); Distributing knowledge in building; Arhus, June 12 - 14, Denmark
|
2006 |
Dawood, Nashwan; Sikka, Sushant (2006).
Visual 4D Planning in the UK Construction Industry.
|
2001 |
Kirkwood, John S.; Freewood, Madeleine (2001).
Web based Learning in real estate education and practice. 8th European Real Estate Society Conference (26-29 June 2001) Alicante, Spain
|
1992 |
Woodbury R (1992).
What's in a part?. Vanier D, Russell T (ed.); Computers and information in construction; Montreal, May, Canada
|
2020 |
Y Alani, N Dawood, S Rodriguez, H Dawood (2020).
Whole Life Cycle Construction Information Flow using Semantic Web Technologies: A Case for Infrastructure Projects. Proceedings of the 37th International Conference of CIB W78, Sao Paulo - online, BR, 18-20 August, pp. 141-155
|