Digital library of construction informatics and information technology in civil engineering and construction
ITC
Digital library
Home
All papers
Browse by series
Browse by authors
Browse by keywords
Browse by years
Papers with keyword 4d:
Year
Paper
Year
Paper
2007
Jan Tulke, Jochen Hanff (2007).
4D construction sequence planning – new process and data model
.
79
2011
T Hartmann (2011).
4D models to support safe planning of hospital renovations
.
Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October
2011
S Kubicki, C Boton (2011).
4D-BASED TEACHING OF HIGH-RISE STRUCTURAL PRINCIPLES.
.
Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October
2007
Doulis, Mario; Vogel, Manfred; Pfluger, Jan; Rietmann, Marco; and Raps, Michael (2007).
4Dive - A 4D Interface for the Visualization of Construction Processes in a Virtual Environment
.
7th International Conference on Construction Applications of Virtual Reality (CONVR 2007), Oct. 22-23, University Park, PA, 28-39.
2008
Ha_kan Norberg & Thomas Olofsson (2008).
A PROCESS MODEL FOR CONSTRUCTION SYNCHRONISATION USING TIME-SPACE PLANNING METHODS AND FIELD FORCE AUTOMATION
.
CIB W78 2008 - Improving the management of construction projects through IT adoption
2013
Zhou W,Tah J,Heesom D (2013).
A distributed virtual reality application framework for collaborative construction planning using Bimserver
.
CONVR 2013
2021
C A Osorio-Sandoval, W Collinge, M H Mosleh, C M Cheung, P Manu, A Freitas, J Bowles (2021).
A method to implement prevention through design using 4D BIM
.
Proceedings of the 38th International Conference of CIB W78, Luxembourg, 13-15 October, pp 158-164
2007
Lingyun Wang, John I. Messner, Robert Leicht (2007).
Assessement of 4D modeling for schedule visualization in construction engineering education
.
737
2017
Zoran Pučko and Danijel Rebolj (2017).
Automated Construction Progress Monitoring Using Continuous Multipoint Indoor and Outdoor 3D Scanning
.
Lean and Computing in Construction Congress (LC3): Volume I Ð Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 105-112
2010
Rolf Büchmann-Slorup, Niclas Andersson (2010).
BIM-Based Scheduling of Construction – A Comparative Analysis of Prevailing and BIM-Based Scheduling Processes
.
CIB W78 2010 - Applications of IT in the AEC Industry
2010
Conrad Boton, Sylvain Kubicki, Gilles Halin (2010).
Collaborative Construction Planning: Towards 4D Visualizations Adapted to Practitioners Requirements
.
CIB W78 2010 - Applications of IT in the AEC Industry
2008
Manfred Breit, Manfred Vogel, Fritz Ha_ubi, Fabian Ma_rki, Marco Soldati, La_szlo_ Istva_n Etesi, Nicky Hochmuth, Andreas Walther (2008).
ENHANCEMENT OF VIRTUAL DESIGN AND CONSTRUCTION METHODS
.
CIB W78 2008 - Improving the management of construction projects through IT adoption
2013
Semenov V,Anichkin A,Morozov S,Tarlapan O,Zolotov V (2013).
Effective project scheduling under workspace congestion and workflow disturbance factors
.
CONVR 2013
2021
A Imran, E Hjelseth (2021).
Exploring challenges with reciprocal interdependencies in 4D BIM
.
Proceedings of the 38th International Conference of CIB W78, Luxembourg, 13-15 October, pp 447-456
2011
C McCartney, L Kiroff (2011).
Factors affecting the uptake of BIM in the Auckland Architecture, Engineering and Construction (AEC) industry
.
Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October
2001
Liston K., Fischer, M. and Winograd, T. (2001).
Focused Sharing of Information for Multidisciplinary Decision Making by Project Teams
.
Electronic Journal of Information technology in Construction, Vol. 6, pg. 69-81.
2007
Hammad, Amin and Motamedi, Ali (2007).
Framework for Lifecycle Status Tracking and Visualization of Constructed Facility Components
.
7th International Conference on Construction Applications of Virtual Reality (CONVR 2007), Oct. 22-23, University Park, PA, 224-232.
2011
V Semanov, OTarlapan, S Morozov,K Kazakov, V Zolotov (2011).
Global path planning in large-scale environments using metric and topological schemes
.
Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October
2008
R. K. Shah, N. Dawood (2008).
IMPROVING COMMUNICATION OF SCHEDULING INFORMATION OF EARTHWORK CONSTRUCTION PROCESS USING 4D VISUALISATION MODEL IN ROAD PROJECTS
.
CIB W78 2008 - Improving the management of construction projects through IT adoption
2007
Dawood, Nash and Sikka, Sushant (2007).
Measuring the Effectiveness of 4D Planning as a Valuable Communication Tool
.
7th International Conference on Construction Applications of Virtual Reality (CONVR 2007), Oct. 22-23, University Park, PA, 198-205.
2007
Nashwan Dawood, Sushant Sikka (2007).
Measuring the efectiveness of 4D planning as a valuable communication tool
.
393
2017
Hengwei Wang, Jiarui Lin and Jianping Zhang (2017).
Operation-Level 4D Modeling and Visualization for Modular Building Based on Standard Activity Library
.
Lean and Computing in Construction Congress (LC3): Volume I Ð Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 841-848
2017
Juergen Melzner, Jochen Hanff and Jochen Teizer (2017).
Pattern-Based Generation of 4D-Schedules for Robust Construction Management
.
Lean and Computing in Construction Congress (LC3): Volume I Ð Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 185-192
2017
Henk Freimuth, Jan Müller and Markus König (2017).
Planning UAV-Assisted Visual Inspections of Construction Sites
.
Lean and Computing in Construction Congress (LC3): Volume I Ð Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 161-168
2007
Peter Podbreznik, Danijel Rebolj (2007).
Real-time activity tracking system – the development process
.
67
2007
Janne Porkka, Kalle Kähkönen (2007).
Software development approaches and challenges of 4D product models
.
85
2007
N. Shaw, D. Bouchlaghem, D. Kerr (2007).
Strategic review of the production of a 4D construction sequencing model – the lessons learnt
.
213
2008
Jason Lucas, Walid Thabet, Dean Bowman (2008).
USING VIRTUAL PROTOTYPING TECHNIQUES FOR IMPLEMENTATION OF A VIRTUAL CONSTRUCTION ENVIRONMENT (VCE)
.
CIB W78 2008 - Improving the management of construction projects through IT adoption
2007
A. Z. Sampaio, P. G. Henriques (2007).
Virtual reality technology applied in engineering education
.
631
hosted by University of Ljubljana
includes:
W78
© itc.scix.net
inspired by SciX, ported by Robert Klinc [2019]