Digital library of construction informatics and information technology in civil engineering and construction
ITC
Digital library
Home
All papers
Browse by series
Browse by authors
Browse by keywords
Browse by years
Papers with keyword scheduling:
Year
Paper
Year
Paper
2007
Jan Tulke, Jochen Hanff (2007).
4D construction sequence planning – new process and data model
.
79
2017
Maryam Montazer, Danijel Rebolj and Detlef Heck (2017).
A Comparison Review of Automated Construction Scheduling Methods
.
Lean and Computing in Construction Congress (LC3): Volume I Ð Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 137-144
2008
Ha_kan Norberg & Thomas Olofsson (2008).
A PROCESS MODEL FOR CONSTRUCTION SYNCHRONISATION USING TIME-SPACE PLANNING METHODS AND FIELD FORCE AUTOMATION
.
CIB W78 2008 - Improving the management of construction projects through IT adoption
2021
Y Jung, F Amer, M Golparvar-Fard (2021).
A systematic review on the requirements on BIM maturity and formal representation of sequencing knowledge for automated construction scheduling
.
Proceedings of the 38th International Conference of CIB W78, Luxembourg, 13-15 October, pp 429-436
2013
Shah R,Dawood N,Castro S (2013).
Automatic generation and visualization of location-based scheduling
.
CONVR 2013
2004
Tesfagaber G, Bouchlaghem N M (2004).
Automation of Process Information Exchange between AEC software Applications using PSL
.
International Journal of IT in Architecture, Engineering and Construction (IT-AEC), Volume 2, Issue 4, Rotterdam: Millpress Science Publishers
2010
Rolf Büchmann-Slorup, Niclas Andersson (2010).
BIM-Based Scheduling of Construction – A Comparative Analysis of Prevailing and BIM-Based Scheduling Processes
.
CIB W78 2010 - Applications of IT in the AEC Industry
2007
W. Huhnt, F. Enge (2007).
Consistent information management for structuring construction activities
.
607
2013
Semenov V,Anichkin A,Morozov S,Tarlapan O,Zolotov V (2013).
Effective project scheduling under workspace congestion and workflow disturbance factors
.
CONVR 2013
2011
V Semanov, OTarlapan, S Morozov,K Kazakov, V Zolotov (2011).
Global path planning in large-scale environments using metric and topological schemes
.
Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October
2013
Siu M-F,Lu M,AbouRizk S (2013).
Improving sophistication and representation of skilled labor schedules on plant shutdown and maintenance projects
.
CONVR 2013
1999
Froese T, Fischer M, Grobler F, Ritzenthaler J, Yu K, Sutherland S, Staub S, Akinci B, Akbas R, Koo B, Barron A, Kunz J (1999).
Industry Foundation Classes for Project Management - A Trial Implementation
.
Electronic Journal of Information technology in Construction, Vol. 4, pg. 17-36.
2017
Dimitra Chondrogianni, Christos Gioldasis and Yorgos Stephanedes (2017).
Low-Cost Fleet Management Solutions in the Framework of Emerging Markets
.
Lean and Computing in Construction Congress (LC3): Volume I Ð Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 561-570
2007
Can Ersen F?rat, Juhani Kiiras, Kalle Kähkönen, Pekka Huovinen (2007).
Model based scheduling in building projects – is it oxymoron?
.
337
2013
Santos de Andrade, Ludmila; Neander Furtado Silva; Ecilamar Maciel de Lima; Igor Monteiro (2013).
Os Sistemas BIM e a Redução de Inexatidões e Tempo nas Obras Públicas Brasileiras
.
SIGraDi 2013 [Proceedings of the 17th Conference of the Iberoamerican Society of Digital Graphics - ISBN: 978-956-7051-86-1] Chile - Valparaíso 20 - 22 November 2013, pp. 284 - 287
2010
Can Ersen Firat, David Arditi, Juho-Pekka Hamalainen, Johan Stenstrand, Juhani Kiiras (2010).
Quantity Take-Off in Model-Based Systems
.
CIB W78 2010 - Applications of IT in the AEC Industry
1997
Andersson N (1997).
Re-engineering of the project planning processstrategic implementation of project management software
.
Drogemuller R (editor); International council for building research studies and documentation. workshop (1997, Cairns) Information technology support for construction process reengineering Proceedings of CIB workshop - w78 “Working commission on information technology in construction” and tg10 “Task group on computer representation of design standards and building codes”, Cairns, Queensland, Australia, July 9th-11th, 1997; ISBN 086-443-636X
2003
Senouci A B, Naji K K (2003).
Resource-constrained scheduling of construction projects using genetic algorithms
.
International Journal of IT in Architecture, Engineering and Construction (IT-AEC), Volume 1, Issue 3, Rotterdam: Millpress Science Publishers
2007
Janne Porkka, Kalle Kähkönen (2007).
Software development approaches and challenges of 4D product models
.
85
2013
Bügler M,Dori G,Borrmann A (2013).
Swap based process schedule optimization using discrete-event simulation
.
CONVR 2013
hosted by University of Ljubljana
includes:
W78
© itc.scix.net
inspired by SciX, ported by Robert Klinc [2019]